Test the resource, not the learner’s confidence alone
Proposed plan / Not a completed study / Fictional onboarding-rescue demonstration
The question
Can a new colleague use the revised guide and desk card to handle representative booking requests without making unsupported promises or hiding unresolved work?
No real learner outcomes or business savings have been measured for this portfolio sample.
Before testing a real version
Have the actual business owner approve the procedure, source hierarchy, escalation role, data handling, and success criteria. Recruit representative learners with consent. Make participation accessible and voluntary; do not use a small design trial for employment decisions. Use fictional or explicitly cleared requests.
Compare fairly
Keep a non-AI baseline: the approved existing resource or process, not an artificially bad version created to make the redesign win. Use equivalent tasks and instructions. Rotate the order or use matched task sets where practical to reduce practice effects. Record which resource, version, and task each person used.
The deliberately messy source packet in this case study is a design exhibit. It is not a measured real-world baseline.
Observe the work
- Can the participant locate the governing instruction?
- Does the response distinguish a drop-off slot from repair completion?
- Are required details and calendar availability checked before confirmation?
- Does an unresolved case stay pending and reach the correct owner?
- Where does the learner hesitate, search, or need help?
- How long does it take to find the next instruction, under the same task conditions?
Record observable behaviour separately from the participant’s explanation or confidence rating. Keep all attempts, including failures and interruptions. Do not collect unnecessary personal information; use participant codes and a suitable retention plan.
Decide what would make you revise
A useful formative gate is no unsupported promise in the tested critical cases and a visible escalation route for every unresolved request. This is a proposed design gate, not proof that a small sample establishes a universal zero-error rate.
If the aid is hard to find, the wording is ambiguous, or the stop route fails, revise the resource before increasing rollout. A faster answer that makes the wrong promise is not an improvement.
Report honestly
Report the sample, task set, resource versions, procedure, errors, help needed, timing method, and limitations. Distinguish observations from estimates. Do not claim retention without a later check or business savings without a comparable full-cost measurement.
Keep the loop open
Assign an actual resource owner and review trigger. When the governing rule changes, check the guide, desk card, examples, practice feedback, and walkthrough together. Record the version and approval, rather than letting another stale note become the new policy.